Trafford Waters.
A residential neighbourhood,
on the water.
First phase of a 208-apartment scheme within Peel's wider Trafford Waters masterplan, between the Trafford Centre and Manchester Ship Canal.
A long-term
BTR address,
on the water.
[Directors to rewrite naturally. Phase one of a larger build-to-rent scheme at Peel's Trafford Waters masterplan. Designed for long-tenancy quality, not turnover.]
[Engineering brief — BTR demands maintainability over decades, predictable running costs for the operator, and resident comfort that doesn't degrade through service life. That shapes every decision upstream.]
[Continuation — masterplan context, Peel relationship, infrastructure interfaces with the wider waters development.]
Designed to
operate well,
for decades.
[Directors to rewrite naturally. Full MEP design and modelling, in collaboration with LRW and Bridgestone, working into Peel's masterplan infrastructure.]
Mechanical
[Heat strategy for BTR — operator cost, resident comfort, low maintenance. Heat pump / heat network choice.]
Electrical
[LV distribution, sub-metering for operator billing, lighting, EV-ready infrastructure.]
Public Health
[Drainage and water services. Interface with masterplan SuDS / utility corridors.]
Sustainability
[Net-zero pathway for long-tenure BTR — operator running cost, resident comfort over decades, carbon footprint against the masterplan's sustainability obligations.]
Phase one,
under way.
[Directors to rewrite naturally. Construction milestones. Peel relationship. Outlook for subsequent phases.]